+86 18876254353

export5@vmgroup.cn

facebook linkedin youtube

Industry knowledge

Home /News /Industry knowledge /

Working time parameters of excavator and parts maintenance plans

Latest News

Undercarriage part

Undercarriage part

Apr 13, 2024

Track roller: Located in the lower part of the und

Saudi Arabian customers deliver 2 cabinets, the products are mainly based on Komatsu

Saudi Arabian customers deliver 2 cabinets, the products are mainly based on Komatsu

Jul 11, 2020

mainly including PC200 track roller,PC200 track ch

2020 Guangzhou International Anti-epidemic Materials and Equipment Fair

2020 Guangzhou International Anti-epidemic Materials and Equipment Fair

Jun 15, 2020

From June 10th to 11th, 2020, Fujian Victory Machi

Philippine customers export Komatsu undercarriage parts bulk cargo

Philippine customers export Komatsu undercarriage parts bulk cargo

2019-10-21

Date: October 21th, 2019 Philippine customers expo

Indonesian customers export a cabinet for E200B track chain,SH200 Top roller and ex200 h-link

Indonesian customers export a cabinet for E200B track chain,SH200 Top roller and ex200 h-link

Oct 16, 2019

Date: September 8th, 2019 Indonesian customer

Working time parameters of excavator and parts maintenance plans

21 Sep, 2018

Two checks are required before starting:

1. Check the oil level, open the fuel switch, and confirm (lubricating oil, fuel) with or without leakage.

2. Check the air filter and block indicator, check the coolant level and radiator, turn on the main power switch, set

the throttle to idle, disengage the clutch or place the transmission in neutral.

Checks that need to be done before stopping:

First let the engine run at light load for 3 minutes, disengage the clutch or place the rotating device in neutral, press

the stop button, disconnect the electrical system after the engine stops, check the equipment for leaks, and if it is to

be shut down for a while, it should be disconnected. Main power switch.

Excavator maintenance plan (including 50 hours, 250 hours, 400 hours, 50-250 hours, 800 hours, 1000 hours, 2000 hours)

For every 250 hours of operation, the engine oil should be replaced. The oil should be added to meet the oil

standard requirements of the equipment manufacturer.

Every 50 hours of operation, check the fuel oil water separator to discharge the separated water and impurities.

Change lubricant, lube filter and bypass filter for every 50-250 hours/maximum every 12 months.

Drain the fuel in the fuel tank every 400 hours/maximum every 12 months. Clean the fuel tank. Check or replace

the fuel filter.

Check the intake line for leaks and leaks on the joint surface of the functional unit every 800 hours/maximum every

12 months.

Replace the coolant filter every 1000 hours / every 6 months, do not replace the coolant at the same time.

Every 2000 hours, check the turbocharger, check and adjust the valve clearance, replace the coolant, check the

electrical system every 12 months using a diagnostic tool, general inspection, replace the air filter, clean the engine,

replace the fuel tank vent filter , replace the air compressor filter.

Check/flush the cooling system and replace the coolant every 10,000 hours/maximum every 48 months.

For the use of lubricating oil, coolant and fuel, please strictly follow the requirements of the

equipment manufacturer and regularly replace the lubricating oil and coolant that meet the standard.

The fuel should be the standard oil of the regular channel, and the sulfur content should not exceed

1.5%.


Long-term unused storage preparation work

The storage period is less than 8 months, the engine oil and lubricating oil filter are replaced, and

then run to the normal working temperature for more than 8 months. The lubricating oil and fuel

system are maintained with protective oil.

 
Send Us An Inquiry GET A QUOTE ONLINE