+86 18876254353
Two checks are required before starting: 1. Check the oil level, open the fuel switch, and confirm (lubricating oil, fuel) with or without leakage. 2. Check the air filter and block indicator, check the coolant level and radiator, turn on the main power switch, set the throttle to idle, disengage th...
Read MoreThe dozer blade is the most important working device on the bulldozer. Many people mistakenly believe that it is not a blade. What is the technical content? In fact, there are many kinds of dozer blades, and there are so many scholars inside. 1.Our common bulldozer blade has a small arc and side pla...
Read More1. Use a unified signal to work together If there are more than 2 locomotives working at the same time, the signal officer should be specified, and the signals, gestures, etc. used should be specified. 2. Working in urban areas Use the "No Entry" sign to keep others away from the work area. If the o...
Read MoreAlthough the undercarriage is a little iron guy, it is also very important for the excavator, and it is the most easily overlooked. The undercarriage parts is mainly include: track roller, carrier roller, front idler, sprocket and track link, commonly known as the four-wheeled belt. 1. track ro...
Read MoreExcavators often have the phenomenon that the track chain plates fall off during work, especially the machines that drive for a long time. The operators with insufficient operation experience often have no countermeasures. How to assemble the chain after the chain is detached? How to reduce or Is it...
Read More